Other measures

Other measures

"Other measures" serve in a special way the purpose of this law (EEG)and/or an energy strategy adopted by the government (e.g. Energy Strategy 2020), in particular energy consulting, increasing electricity efficiency in large buildings or efficiency programs.

The purpose is to support the efficient use of energy, as well as to promote the use of renewable energy. In particular, the degree of environmental impact, the use of renewable energy, the degree of self-sufficiency, energy efficiency, economic viability and the exemplary effect fall in the assessment into weight.

Funding application/ Construction completion certificate

The funding application and the power of attorney must generally be submitted in full and in paper form, including all attachments. Submissions via email are not sufficient. The content of applications will only be processed once the application documents have been received in full.

PDF Antrag Förderung Andere Massnahmen, Stand 01.03.2020

Berechnungstool Einzelmassnahmen

  • Industrial engines
  • Process steam plant
  • Replacement of lighting (LED)
  • Circulation pumps
  • Commercial waste heat recovery
  • etc.

Please refer to the calculation tool for proof of individual measures.

Funding application/ Construction completion certificate

The procedure analysis and consultation of a potential redevelopment of building and building services equipment is funded.

Please refer to the Merkblatt Sanierungsberatung.

The funding application and the power of attorney must generally be submitted in full and in paper form, including all attachments. Submissions via email are not sufficient. The content of applications will only be processed once the application documents have been received in full.

PDF Antrag Förderung Andere Massnahmen, Stand 01.03.2020

Heizungsfernsteuerungen für reine, bestehende Ferienwohnungen in Alpengebieten werden gefördert.

Please refer to thes Merkblatt Heizungsfernsteuerung.

The funding application and the power of attorney must generally be submitted in full and in paper form, including all attachments. Submissions via email are not sufficient. The content of applications will only be processed once the application documents have been received in full.

PDF Antrag Förderung Andere Massnahmen, Stand 01.03.2020

  • To support electromobility, the Energy Commission decided at its meeting on June 28, 2016, that one fast-charging station per municipality should be funded
  • These municipality are already allocated: Ruggell, Schaan, Bendern, Balzers
  • Funding 20% of the investment contribution or max. CHF 10,000. The principle of the faster after receipt of application applies.
  • Conditions: The charging station must be publicly accessible and operated with green electricity.

31.08.2021

The Energy Commission made the decision on 31.08.2021, to extend the impulse program line expansion outside the construction zone beyond the set framework of 1 MWp in connection with photovoltaic systems.

The Energy Commission promotes the line extension outside the building zone within the framework of an impulse program until further notice without direct power limitation

  • The decisive factor for the assessment is the receipt of the application
  • The goal of the impulse program is the further construction of large PV systems to achieve the goals of the Energy Strategy 2030.
  • Support contributions for line expansion can be applied for under "other facilities and other measures". The maximum contribution is capped at 400CHF/kWp of additional PV power, as the best possible cost / benefit ratio is sought.
  • An existing plant is not counted in the power calculation.
  • The subsidy is based on the proven eligible costs incurred due to the construction of an additional PV system for the line expansion.
  • The PV systems themselves can be funded separately according to the applicable funding rates

Funding line extension

Promotion photovoltaic installations

Contact persons