Energy financial support
The following measures are promoted via the Energy Efficiency Act
Heat insulation of existing buildings
MinergieP and MinergieA certified buildings
Building services systems
CHP plants
Thermal solar collectors
Heat pump boilers
Photovoltaic systems
Demonstration objects
Other installations and other measures
The municipalities in Liechtenstein additionally make an individual contribution to the state subsidies. In addition to the state subsidy, most municipalities will provide you with a subsidy of up to 100% of the state subsidy up to the respective maximum limit. In your specific case, please inquire directly with your municipality. Subject to any changes made by the municipalities, the funding rates / municipal maximum limits / etc. can usually be found on their websites in the funding brochure
Informing/planning Comprehensive information by the energy specialist office and the expert advice of the planning office result in an individual and optimal solution.
Fund application Depending on the intended funding measure, the designated application form must be used and submitted to the energy office. In order to apply for subsidies, in most cases a legally binding building permit must be available. After reviewing the documents, a decision is made on eligibility and the amount of the subsidy.
Assurance/realization The assurance for the receipt of the subsidy is issued by the energy office. Implementation of the eligible measure may not begin until this assurance has been received.
Important !! The right to receive subsidies expires if the measure is started before a legally binding assurance of the subsidies is available.
Acceptance / payment The payment of the subsidies of the country takes place after the technical acceptance of the subsidized plant.
Funding Application
The Funding application and the power of attorney must always be submitted incl. all enclosures complete and in paper form. Submissions by e-mail are not sufficient. The substantive processing of applications will only take place once the application documents have been received in full.
Antrag auf Förderung Energieeffizienzgesetz (Onlineschalter)
Vorlage Verfahrensvollmacht Förderantrag
Laws
Contact persons
-
Energy Office [email protected] +423 236 69 88